FOR THE PEOPLE RUNNING THE WORK

Your jobsite.
Under control.

Know what’s done.
See what’s next.
Keep the whole crew moving.

Hours, progress, deliveries and Atlas AI.
One clear picture of your job.

Free to start. No card needed. Built for every trade.

See the whole job come together.

56-second walkthrough
Demo System 1 with activity progress bars and a separate crew-hour allowanceWatch Atlas in actionTurn the sound on for a guided tour

Systems, crew hours, drawings, deliveries, Atlas AI & reports.Illustrative walkthrough · demo records · Pro features shown.

YOUR TRADE.
YOUR WAY.

Electrical · HVAC · Plumbing · Fire protection · Concrete · Drywall · And yours.

THE DETAILS YOUR CREW NEEDS

Less chasing.
More building.

See completed work, keep deliveries straight and find the record when you need it.

Progress example · fictional job
Branch line · Level 240%

200 of 500 feet completed

Crew hours
40
Allowed
150
Remaining ft
300
01 / KNOW WHAT’S DONE

Progress you can
come back to.

Open saved work in Progress. Edit its details, add the next update and keep the quantity and hour history together.

Explore Progress
Delivery example · fictional job
Light fixtures · Part received
Ordered
60
Received
40
Outstanding
20

Keep expected deliveries separate from material actually received.

02 / SEE WHAT’S MISSING

The delivery.
The remaining balance.

Record what arrives, see what is still outstanding and set a reminder to follow up.

Explore Deliveries
Atlas example · fictional job
“Three people, eight hours.
18 light fixtures installed.”
Crew hours
24
Installed
18
Review before saving
03 / SKIP THE RETYPING

Your update.
Organized by Atlas.

Describe the shift in your own words. Review the details and choose where to save the work.

Try a trade example
BUSINESS PRO · UNLIMITED ATLAS AI

Show the work.
Build the estimate.

Photo estimates with short questions, confirmed costs, tax choices, and editable drafts—all in Business Pro. Start with photos, check measurements, and review before sharing.

Explore photo estimates + unlimited AI

No daily or monthly AI cap. No per-request charges. Short request-rate limits protect availability.

  1. 1 · Add photosShow the work and describe the job.
  2. 2 · Confirm the detailsAnswer short questions and check quantities.
  3. 3 · Use your pricesEnter costs, overhead, markup and verified tax.
  4. 4 · Review the estimateEdit the draft before saving or sharing.
ATLAS AI / PRO & BUSINESS PRO

It speaks
your trade.

Pick an example. See how the words
become hours and measured work.

A field update, in your words
“Three of us worked eight hours on Level 2. We installed 18 light fixtures today. Draft the hours and progress.”

Your words. Your units. Track fixtures, feet, sheets, cubic yards, squares or another measure.

Organized for reviewIllustrative example
Crew hours3 people × 8 hours
24 person-hours
Completed workLight fixtures · Level 2
18 fixtures installed

No total scope was given, so the target stays unknown. Eighteen installed does not mean the job is 18% complete.

Examples are illustrative. Review important details. Clear updates can save automatically when chat auto-save is enabled; unclear details wait for confirmation.

Explore a full shift & download a sample report

Explore an interactive example

FIELD COMMANDNorth warehouse · System 1
Illustrative demo
ASK ATLAS PRO
YOUR FIELD UPDATE

“Ten of us worked ten hours on System 1. We installed 100 feet of branch line and 50 heads.”

Organized. Ready for your review.

CREW LABOR100person-hours
BRANCH LINE100ft installed
SPRINKLER HEADS50heads installed
The details stay with the right job.
Fictional records. Real workflow.
Try the idea. No account needed.

One shift.
A clearer next move.

Follow a fictional warehouse job from a field update to a plan and a report. Switch views to see how the details connect.

INTERACTIVE SAMPLE

North warehouse · Electrical fit-out

Wed, Oct 14 · Fictional job
A field update, in your words
“Three of us worked 8 hours. We installed 18 of the 60 planned light fixtures. Forty of the 60 fixtures arrived.”

This sample combines hours, completed work and a material receipt. Atlas can draft hours and progress; record actual arrivals in Deliveries → Record received.

Try Atlas with your own job

The details, together.

Example result
Crew labor 3 people × 8 hours each
24 person-hours
Measured progress 18 installed · 60 fixtures planned
42 fixtures left to install
Material receipt 40 received · 60 ordered
20 fixtures outstanding

A target stays a target. Only completed work counts toward progress.

A FEW QUICK ANSWERS

Made for
the real work.

Does it fit my trade?

Use your own units and organize the job by systems, zones, floors, areas or column lines. Atlas is built for foremen, superintendents and contractors across the trades.

Can I use it on my phone?

Yes. Use Atlas in your phone or computer browser. Shared jobs require an internet connection. We’re preparing the native iPhone app for release. You can start on the website today.

Does starting free require a card?

No. Create a free account and begin with manual job records. A paid subscription starts only when you choose to purchase one.

Will Job Pulse send a phone notification?

Job Pulse shows attention warnings while you use Atlas. Website push notifications are not enabled. Scheduled reminders and calendar notifications are separate.

WE’RE HERE TO HELP

Questions? Something not working?

Get help with Atlas Ridge Field, your account, or Business Pro.

START WITH YOUR NEXT SHIFT

Good work.
Now keep track of it.

Put Atlas to work

Start free. Bring your crew. Keep the record.

Atlas Ridge Field in action

Demo records. Pro features are shown. No music.

Read the narration

Your day on site moves fast. Atlas Ridge Field helps you keep the work together.

Start with a job and a system. Add the activities and set your targets.

Log what your crew installed and the hours they worked. Progress updates automatically, so you can see each activity and the whole system at a glance.

Keep your plans close. Zoom into a drawing and mark the details your crew needs.

Expecting a delivery? Save a reminder, record what arrives, and see what's still outstanding.

Give unfinished work a deadline. Job Pulse helps you spot what's due soon.

With Atlas AI, describe the shift in your own words, then review the details before saving.

And when the day is done, bring your saved work into a clear report.

Less chasing information. A clearer picture of your job. Start your next shift with Atlas Ridge Field.